Installation instructions for Terracarpet quartz systems
1. Substrate Preparation
Moisture ≤4% for cementitious substrates.
Application temperature: +10°C to +30°C.
Mechanical preparation (milling, shot blasting).
Cleaning of dust, oils, loose materials.
2. Primer Application
Types: Water-based, Solvent-free, Wet-on-Wet, General Purpose.
Consumption: 0.15–0.30 kg/m².
3. Mixing resin and aggregates
Ratio: 1 part resin : 20 parts aggregates.
Stir with a low-speed mechanical mixer.
Working time: 20–30 minutes at 20°C.
4. System Application
Layer thickness: 3–5–10 mm (depending on grain size).
Tools: trowel, roller.
Uniform distribution without the need for sanding.
5. Curing
Light traffic: after 24 hours.
Heavy loads: after 7 days.
Full hardening: 48 hours.
Material Consumption Table
Primer: From 0.150–0.300 kg/m².
Resin: From 0.400–0.500 kg/m².
Aggregate: From 0.8–1.3 kg/m² per mm of thickness (depending on grain size).
Safety Warnings
Use gloves, mask, and goggles.
Avoid application at temperatures
<
10°C or
>
30°C.
Store materials in a cool, dry place.
List of Tools
Trowel.
Low-speed mixer.
Mixing buckets.
Roller.